[KIDS] Fwd: Fwd: Re: technical / down time scheduled for VST?
Gijs Verdoes Kleijn
verdoes at astro.rug.nl
Thu Jul 4 22:37:53 CEST 2013
FYI
-------- Origineel bericht --------
Onderwerp: Fwd: Re: technical / down time scheduled for VST?
Datum: Fri, 21 Jun 2013 10:39:26 +0200
Van: Jelte de Jong <jelte at strw.leidenuniv.nl>
Aan: kids at strw.leidenuniv.nl <kids at strw.leidenuniv.nl>
-------- Original Message --------
Subject: Re: technical / down time scheduled for VST?
Date: Thu, 20 Jun 2013 21:47:22 -0400
From: Thomas Szeifert <tszeifer at eso.org>
To: Steffen Mieske <smieske at eso.org>
CC: Jelte de Jong <jelte at strw.leidenuniv.nl>
Dear Steffen, Jelte,
it is only now that I have a date for interventions:
22./23.06.2013 Exchange of damaged cables in the rotator cable wrap
Dismounting of the Cassegrain adapter cooling hose form the system
22./23.07.2013 Dismounting OmegaCAM
Adapter functions test
TCCD cooling repair (clogged or disconnected lines)
TCCD cable exchange (damaged during the rotator incident)
OmegaCAM interlock implementation (remaining item from punch list)
Relocation of cooling hoses to access altitude motors
Filter installation on telescope cooling lines
Remounting OmegaCAM and recommissioning of the full system
The 2nd intervention will for sure take longer then a day - details are
still to be defined.
cheers,
Thomas
On 05/22/2013 02:57 PM, Steffen Mieske wrote:
> Hi Jelte,
>
> I put in CC also Thomas. There used to be talk of a telescope
> intervention, which depends on INAF availability. I am not up to date as
> to the latest developments in this respect.
>
> Otherwise I am not aware of a pending intervention. We had a bad OCAM
> blackout last week of which you surely are aware...
>
> By the way, we still lack the 32CCD secondary standard OB for the Polar
> field ..:_).
>
> Cheers and thanks,
> Steffen
>
>
> On Wed, 2013-05-22 at 17:18 +0200, Jelte de Jong wrote:
>> Hi Steffen,
>>
>> we are planning a migration of our database system to new hardware.
>> Since this will involve some downtime for our data processing system, we
>> were wondering if any technical time or anything else that will cause
>> the telescope to not be operational happens to be scheduled during the
>> coming month or so.
>> If so, we can do our database migration during that same period.
>>
>> Cheers,
>> Jelte
>>
--
--------------------------------------------------------------------
|dr Gijs Verdoes Kleijn | astronomer |
|e-mail: verdoes at astro.rug.nl | OmegaCEN / Kapteyn Institute / |
|www: www.astro.rug.nl/~verdoes | Target |
|tel: +31-50-3638326 | University of Groningen |
|mobile: +31-654658050 | postal address: |
| | Kapteyn Astronomical Institute |
| | Postbus 800, 9700 AV, Groningen|
| | The Netherlands |
--------------------------------------------------------------------
-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://listman.astro-wise.org/pipermail/kids/attachments/20130704/1a696525/attachment.html
More information about the KiDS
mailing list